fbpx

C.3 Regulated Projects Guide single PDF

Table Of Contents Of The C.3 Regulated Projects Guide (Version 1.0)

Chapter/Appendix  Section Title Last Updated
Chapter 1 Cover Page / Table of Contents / Glossary
Introduction/How to Use this Handbook
02/2020
02/2020
Chapter 2 Background/Regulatory Requirements 02/2020
Chapter 3 Preparing Permit Application Submittals 02/2020
Chapter 4 Site Design Measures 02/2020
Chapter 5 General Technical Guidance for Treatment Measures 02/2020
Chapter 6 Technical Guidance for Specific Treatment Measures 02/2020
6.1 Bioretention Area 02/2020
6.2 Flow-Through Planter 02/2020
6.3 Tree Well Filter 02/2020
6.4 Infiltration Trench 02/2020
6.5 Extended Detention Basin 02/2020
6.6 Pervious Paving 02/2020
6.7 Reinforced Grid Paving 02/2020
6.8 Green Roof 02/2020
6.9 Rainwater Harvesting and Use 02/2020
6.10 Media Filter 02/2020
6.11 Subsurface Infiltration System 02/2020
Chapter 7 Hydromodification Management Measures 02/2020
Chapter 8 Operation and Maintenance 02/2020
Chapter 9 Alternative Compliance 02/2020
References 02/2020
Appendix A Plant List and Planting Guidance 02/2020
Appendix B Example Development Scenarios 02/2020
Appendix C Treatment Measure Design Criteria Regions for San Mateo County 02/2020
Appendix D Applicability of Inlet Filters, Oil/Water Separators and Hydrodynamic Separators 02/2020
Appendix E Infiltration Guidelines 02/2020
Appendix F Mosquito Control 02/2020
Appendix G Operation and Maintenance Document Templates
Stormwater Treatment Measure O&M Inspection Report Template
Bioretention Area Template
Flow-through Planter Maintenance Plan Template
Tree Well Filter Maintenance Plan Template
Infiltration Trench Maintenance Plan Template
Extended Detention Basin Maintenance Plan Template
Pervious Pavement Maintenance Plan Template
Non-proprietary Media Filter Maintenance Plan Template
Manufactured Stormwater Treatment Measure Maintenance Plan Template
Rainwater Harvesting
02/2020
01/2022
01/2022
01/2022
01/2022
01/2022
01/2022
01/2022
01/2022
01/2022
01/2022
Appendix H Areas Subject to Hydromodification Management Requirements 02/2020
Appendix I Feasibility Evaluation: Infiltration and Rainwater Harvesting/Use 02/2020
Appendix J Special Projects 02/2020
Appendix K Soil Specifications 02/2020
Appendix L Site Design Requirements for Small Projects 02/2020