C.3 Regulated Projects Guide single PDF Table Of Contents Of The C.3 Regulated Projects Guide (Version 1.0) Chapter/Appendix Section Title Last Updated Chapter 1 Cover Page / Table of Contents / Glossary Introduction/How to Use this Handbook 02/2020 02/2020 Chapter 2 Background/Regulatory Requirements 02/2020 Chapter 3 Preparing Permit Application Submittals 02/2020 Chapter 4 Site Design Measures 02/2020 Chapter 5 General Technical Guidance for Treatment Measures 02/2020 Chapter 6 Technical Guidance for Specific Treatment Measures 02/2020 6.1 Bioretention Area 02/2020 6.2 Flow-Through Planter 02/2020 6.3 Tree Well Filter 02/2020 6.4 Infiltration Trench 02/2020 6.5 Extended Detention Basin 02/2020 6.6 Pervious Paving 02/2020 6.7 Reinforced Grid Paving 02/2020 6.8 Green Roof 02/2020 6.9 Rainwater Harvesting and Use 02/2020 6.10 Media Filter 02/2020 6.11 Subsurface Infiltration System 02/2020 Chapter 7 Hydromodification Management Measures 02/2020 Chapter 8 Operation and Maintenance 02/2020 Chapter 9 Alternative Compliance 02/2020 References 02/2020 Appendix A Plant List and Planting Guidance 02/2020 Appendix B Example Development Scenarios 02/2020 Appendix C Treatment Measure Design Criteria Regions for San Mateo County 02/2020 Appendix D Applicability of Inlet Filters, Oil/Water Separators and Hydrodynamic Separators 02/2020 Appendix E Infiltration Guidelines 02/2020 Appendix F Mosquito Control 02/2020 Appendix G Operation and Maintenance Document Templates Stormwater Treatment Measure O&M Inspection Report Template Bioretention Area Template Flow-through Planter Maintenance Plan Template Tree Well Filter Maintenance Plan Template Infiltration Trench Maintenance Plan Template Extended Detention Basin Maintenance Plan Template Pervious Pavement Maintenance Plan Template Non-proprietary Media Filter Maintenance Plan Template Manufactured Stormwater Treatment Measure Maintenance Plan Template Rainwater Harvesting 02/2020 01/2022 01/2022 01/2022 01/2022 01/2022 01/2022 01/2022 01/2022 01/2022 01/2022 Appendix H Areas Subject to Hydromodification Management Requirements 02/2020 Appendix I Feasibility Evaluation: Infiltration and Rainwater Harvesting/Use 02/2020 Appendix J Special Projects 02/2020 Appendix K Soil Specifications 02/2020 Appendix L Site Design Requirements for Small Projects 02/2020